References

Bakker M (2015) TTim, a multi-aquifer transient analytic element model. Version 0.3. Water Resources Section, Civil Engineering and Geosciences, Delft University of Technology, Delft, The Netherlands.

Franke OL, Reilly TE, and Bennet GD (1987) Definition of boundary and initial conditions in the analysis of saturated groundwater flow systems. An introduction. Chapter B5. Techniques of water resources investigations of the United States Geological Survey. Viewed 5 April 2016, http://pubs.usgs.gov/twri/twri3-b5/pdf/twri_3-B5_a.pdf.

Dawes WR, Macfarlane C, McVicar TR, Wilkes PG, Rachakonda PK, Henderson BL, Ford JH, Hayes KR, O’Grady AP, Marvanek SP and Schmidt RK (2018) Conceptual modelling for the Gloucester subregion. Product 2.3 for the Gloucester subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NSB/GLO/2.3.

Hodgkinson JH, Pinetown KL, Wilkes PG, McVicar TR and Marvanek SP (2014) Coal and coal seam gas resource assessment for the Gloucester subregion. Product 1.2 for the Gloucester subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. Viewed 24 June 2015, http://data.bioregionalassessments.gov.au/product/NSB/GLO/1.2.

Lewis S (2014) Developing a coal resource development pathway. A submethodology from the Bioregional Assessment Technical Programme. Department of the Environment, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. Viewed 3 June 2016, http://data.bioregionalassessments.gov.au/submethodology/M04.

Parsons Brinckerhoff (2015) Updated conceptual hydrogeological model of the Gloucester Basin Technical report by Parsons Brinckerhoff Australia Pty Limited for AGL Upstream Investments Pty Ltd. Parsons Brinckerhoff Australia Pty Limited, Sydney. Viewed 31 March 2016, https://www.agl.com.au/-/media/AGL/About-AGL/Documents/How-We-Source-Energy/Gloucester-Document-Repository/Water-Reports/20151117_Updated-Conceptual-Hydrogeological-Model-of-the-Gloucester-Basin.pdf.

Last updated:
5 November 2018
Thumbnail of the Gloucester subregion

Product Finalisation date

2018
PRODUCT CONTENTS