References

Engeny Water Management (2013) China First / Galilee Coal Project Commonwealth Environmental Impact Statement, Volume 4, Appendix 19 Mine Site Water Management. Viewed 15 October 2015, http://waratahcoal.com/publications/.

Evans T, Pavey C, Cassel R, Ransley T, Sparrow A, Kellett J, Galinec V, Dehelean A, Caruana L and Kilgour P (2018) Conceptual modelling for the Galilee subregion. Product 2.3 for the Galilee subregion from the Lake Eyre Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/LEB/GAL/2.3.

GHD Pty Ltd (2013) Carmichael Coal Mine and Rail Project Supplementary Environmental Impact Statement (SEIS), Appendix K2 Water Balance Report. Report dated 22 October 2013. Viewed 15 October 2015, http://eisdocs.dsdip.qld.gov.au/Carmichael%20Coal%20Mine%20and%20Rail/SEIS/Appendices/Appendix%20K/Appendix-K2-Water-Balance-Report.pdf.

Hansen Bailey Environmental Consultants and MacMines (2015) Project China Stone Draft Environmental Impact Statement: Chapter 13 Surface Water. Viewed 15 October 2015, http://eisdocs.dsdip.qld.gov.au/China%20Stone%20Coal/DEIS/Draft%20EIS%20-%20Volume%201A/china-stone-chapter-13-surface-water.pdf.

Karim F, Hostetler S and Evans T (2018a) Water balance assessment for the Galilee subregion. Product 2.5 for the Galilee subregion from the Lake Eyre Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/LEB/GAL/2.5.

Karim F, Viney NR, Wang B, Peeters LJM, Zhang YQ, Marvanek SP, Shi X, Yang A and Buettikofer H (2018b) Surface water numerical modelling for the Galilee subregion. Product 2.6.1 for the Galilee subregion from the Lake Eyre Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/LEB/GAL/2.6.1.

Peeters L, Ransley T, Turnadge C, Kellett J, Harris-Pascal C, Kilgour P and Evans T (2018) Groundwater numerical modelling for the Galilee subregion. Product 2.6.2 for the Galilee subregion from the Lake Eyre Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/LEB/GAL/2.6.2.

Parsons Brinckerhoff (2011) Alpha Coal Project Supplementary Environmental Impact Statement, Volume 2, Appendix L Site Water Management System and Water Balance technical report. Report dated 11 April 2011. Prepared for Hancock Coal Pty Ltd by PB Pty Ltd. Viewed 15 October 2015, http://gvkhancockcoal.com/documents/Publications/EIS/ACPSEIS2011/Volume2/Volume%202%20Appendix%20%20L%20Site%20Water%20Management%20System%20and%20Water%20Balance%20Technical%20Report%20Issue%203%20Final.pdf.

Resolve Coal Pty Ltd (2015) Hyde Park Coal Project Presentation, dated October 2015. Viewed 12 September 2016, http://www.queenslandexploration.com.au/wp-content/uploads/2012/02/HPCP-Galilee-Resolve-Coal-October-2015.pdf.

URS (2012) Kevin's Corner Supplementary Environmental Impact Statement, Volume 2 appendix M Site Water management (Basis of Design) Report. Dated 3 October 2012. Prepared for Hancock Galilee Pty Ltd by URS Australia. Viewed 15 October, http://gvkhancockcoal.com/documents/Publications/EIS/KevinsCornerSEIS2012/Volume2/Volume%202%20-%20App%20M%20Site%20Water%20Management%20(BoD)%20Report.pdf.

WRM Water and Environment (2014) Additional Environmental Impact Statement South Galilee Coal Project, Volume 1, Chapter 9.3.3 Surface Water Model / Management System. Dated March 2014. Viewed 15 October 2015, http://eisdocs.dsdip.qld.gov.au/South%20Galilee%20Coal/AEIS/Volume%201.pdf.

Last updated:
6 December 2018
Thumbnail of the Galilee subregion

Product Finalisation date

2018

ASSESSMENT