Adhikary DP and Wilkins A (2012) Reducing the impact of longwall extraction on groundwater systems. ACARP Report C18016. The Australian Coal Industry’s Research Program, Australia. Viewed 22 May 2016, http://www.acarp.com.au/abstracts.aspx?repId=C18016.
Bakker M (2013) Semi-analytic modeling of transient multi-layer flow with TTim. Hydrogeology Journal 21(4), 935–943. DOI: 10.1007/s10040-013-0975-2.
Barnett B, Townley LR, Post V, Evans RE, Hunt RJ, Peeters L, Richardson S, Werner AD, Knapton A and Boronkay A (2012) Australian groundwater modelling guidelines. Waterlines report, National Water Commission, Canberra. Viewed 9 May 2016, http://archive.nwc.gov.au/library/waterlines/82.
Barrett DJ, Couch CA, Metcalfe DJ, Lytton L, Adhikary DP and Schmidt RK (2013) Methodology for bioregional assessments of the impacts of coal seam gas and coal mining development on water resources. A report prepared for the Independent Expert Scientific Committee on Coal Seam Gas and Large Coal Mining Development through the Department of the Environment, CSIRO and Geoscience Australia, Australia. Viewed 30 June 2015, http://www.iesc.environment.gov.au/publications/methodology-bioregional-assessments-impacts-coal-seam-gas-and-coal-mining-development-water.
Coffey Geotechnics (2014) Coal seam gas extraction: modelling groundwater impacts. Department of the Environment, Commonwealth of Australia, Canberra.
Crosbie R, Raiber M, Cui T and Viney N (2015) Blending field observations and AWRA outputs for groundwater recharge estimation in a coal basin in eastern Australia. MODSIM 2015.
CSIRO (2008) Water availability in the Murray-Darling Basin. A report to the Australian Government from the CSIRO Murray-Darling Basin Sustainable Yields Project. CSIRO, Australia.
Cui T, Peeters L, Rassam D, Raiber M, Crosbie R, Gilfedder M, Pickett T, Hartcher M, Marvanek S and Bruce C (2016) Groundwater numerical modelling for the Clarence-Moreton bioregion. Product 2.6.2 from the Clarence-Moreton Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/CLM/CLM/2.6.2.
Ford JH, Hayes KR, Henderson BL, Lewis S and Baker PA (2016) Systematic analysis of water-related hazards associated with coal resource development. Submethodology M11 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/submethodology/M11.
Harbaugh AW, Banta ER, Hill MC and McDonald MG (2000) MODFLOW-2000, the U.S. Geological Survey modular ground-water model - user guide to modularization concepts and the Ground-Water Flow Process: U.S. Geological Survey Open-File Report 00-92.
Harbaugh AW and McDonald MG (1996) User's documentation for the US Geological Survey Modular Finite Difference Ground Water Flow Model. US Geological Survey.
Henderson B, Hayes KR, Mount R, Schmidt RK, O'Grady A, Lewis S, Holland K, Dambacher J, Barry S, Holland K and Raiber M (2016) Developing the conceptual model of causal pathways. Submethodology M05 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/submethodology/M05.
Herckenrath D, Doherty J and Panday S (2015) Incorporating the effect of gas in modelling the impact of CBM extraction on regional groundwater systems. Journal of Hydrology 523, 587–601. DOI:10.1016/j.jhydrol.2015.02.012.
Herron NF, Crosbie RS, Viney NR, Peeters LJM and Zhang YQ (2016) Water balance assessment for the Gloucester subregion. Product 2.5 for the Gloucester subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NSB/GLO/2.5.
Lewis S (2014) Developing a coal resource development pathway. A submethodology from the Bioregional Assessment Technical Programme. Department of the Environment, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. Viewed 9 November 2015, http://data.bioregionalassessments.gov.au/submethodology/M04.
Liang X and Zhang Y-K (2013) Analytic solutions to transient groundwater flow under time- dependent sources in a heterogeneous aquifer bounded by fluctuating river stage. Advances in Water Resources 58, 1–9.
Parsons Brinckerhoff (2015) Updated conceptual hydrogeological model of the Gloucester Basin, Technical report by Parsons Brinckerhoff Australia Pty Limited for AGL Upstream Investments Pty Ltd. Parsons Brinckerhoff Australia Pty Limited, Sydney. Viewed 22 April 2016, https://www.agl.com.au/-/media/AGL/About-AGL/Documents/How-We-Source-Energy/Gloucester-Document-Repository/Water-Reports/20151117_Updated-Conceptual-Hydrogeological-Model-of-the-Gloucester-Basin.pdf.
Peeters LJM, Dawes WR, Rachakonda PR, Pagendam DE, Singh RM, Pickett TW, Frery E, Marvanek SP and McVicar TR (2016) Groundwater numerical modelling for the Gloucester subregion. Product 2.6.2 for the Gloucester subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NSB/GLO/2.6.2.
Peeters L, Pagendam D, Gao L, Hosack G, Jiang W and Henderson B (2016) Propagating uncertainty through models. Submethodology M09 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/submethodology/M09.
Rassam D, Walker G and Barnett B (2008) Recommendations for modelling surface–groundwater interactions based on lessons learnt from the Murray-Darling Basin Sustainable Yields Project: A report to the Australian Government from the CSIRO Murray-Darling Basin Sustainable Yields Project. CSIRO, Canberra.
Reilly TE, Franke OL and Bennett GD (1987) The principle of superposition and its application in ground-water hydraulics, in Chapter B6 Techniques of water-resources investigations of the United States Geological Survey, USGS, Denver.
SKM (2006) Stocktake and analysis of Australia’s water accounting practice. Final report. Sinclair Knight Merz, Tatura, Australia. Viewed 22 March 2016, http://www.bom.gov.au/water/about/consultation/document/SKM_Stocktake_Report_2006.pdf.
Viney N (2016) Surface water modelling. Submethodology M06 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/submethodology/M06.
Wilkins A (2015) Richards theory manual. CSIRO, Australia. Viewed 30 June 2015, http://mooseframework.org/wiki/PhysicsModules/Richards.
Yeh HD and Wang CT (2009) Analysis of well residual drawdown after a constant-head test. Journal of Hydrology 373(3), 436–441.
METHODOLOGY FINALISATION DATE
- 1 Background and context
- 2 Modelling philosophy
- 3 Choice of model
- 4 Boundary conditions
- 5 Model time steps and predictive time frame
- 6 Integration with surface water modelling
- 7 Parameterisation
- 8 Calibration, sensitivity analysis and uncertainty analysis
- 9 Meeting the requirement for transparency
- 10 Outputs from groundwater modelling
- References
- Glossary
- Citation
- Acknowledgements
- Contributors to the Technical Programme
- About this submethodology