Breadcrumb
- Home
- Assessments
- Bioregional Assessment Program
- Methods
- Compiling water-dependent assets
- About this submethodology
		Page 9 of 9	
  The following notes are relevant only for this submethodology.
- All reasonable efforts were made to provide all material under a Creative Commons Attribution 3.0 Australia Licence.
- All maps created as part of the BAs for inclusion in this document used the Albers equal area with a central meridian of 140.0° East for the Lake Eyre Basin bioregion and its subregions, and 151.0° East for all other bioregions and subregions. The two standard parallels for all bioregions and subregions are –18.0° and –36.0°.
[1] BAs consider the potential impact to the habitat of species not the individual species per se
	  	
	  	  				  	
	    
	    					Last updated: 				    
	    
	  	  	
	  	
	  
		            
	    13 June 2018	  
	
	  	
	  	 
						
			  		
	    					Summary and download				    
	    
	  	  	
	  	
	  
	
	  	
	  	METHODOLOGY FINALISATION DATE
	    					2015						
			  		
    
  
	    					METHODOLOGY CONTENTS				    
	    
	  	  	
	  	
	  - 1 Background
- 2 Compiling the asset database
- 3 Determining and applying the preliminary assessment extent
- 4 Assessing water dependence of assets
- Appendix A Simple descriptions of key tables within the asset database
- Appendix B Identifying economic assets
- Citation
- Contributors to the Technical Programme
- About this submethodology
	    					ASSESSMENT COMPONENTS				    
	    
	  	  	
	  	
	  
	
	  	
	  	